Continuing the Conversation with Walbridge: Tech that Enhances, Rather than Hinders, Your Processes

Share:

Recently, at Advancing Data Center Construction West, Facility Grid CEO Daniel Russo sat down with Chris Morgan, Group Vice President of Walbridge, to discuss the technology they trust to manage and execute their high-stakes, complex data center projects. The following includes Part 2 of their conversation, focusing on Walbridge’s range of tools they utilize for each project, the importance of being selective in technology, and how the right tech can prevent your worst-case project scenarios.

Daniel: Let’s jump into technology and enablement. So, you’re gracious to provide us a look at your tech stack here. What was involved in curating your stack?

Chris: I was always taught by my grandfather if I’m doing a project, take the whole toolbox. You never know what tool you’re going to need. Don’t just take a screwdriver, because you’re wiring a switch. Might need something else. So, this is our toolbox.

So what we do on every job is we take that to either the client or our project teams and say, what make sense on this job? Big, small, a bigger job is going to have all these things—Facility Grid, obviously. Kwant.AI is a great system for watching people, you know, tagging and documenting who’s coming in on the job site. PLOT for deliveries, Hoylu is electronic pull planning. It takes more wherewithal to do it, but it’s still important.  

Hammertech is great—the safety orientations that are done before people come to the job site, it’s app-driven. People come to the site, they have much shorter orientation before they go to work.

One tool, Tomorrow.io, is near to my heart. These are great tools for us for safety on a job site, how to keep the workforce safe and when to close the job site or not. You predict the weather, not just the day of but days in advance of a storm.

So, these are important tools to us that we use on almost all our jobs.

Daniel: So, using the technology, obviously there’s always challenges in selecting the right technology and getting people to use it. At Walbridge, how do you make it an enabler for efficiency and a streamliner for your jobs rather than a burden? Some tools obviously take more work to put in and use than it does using your own process.

Chris: Yeah, we really try to embrace technology. We try to look at ourselves first. We’re a good company with good processes. We do a lot of things right, so we want the technology to match that, to enhance what we do, not necessarily change what we do.

When we became an ISO certified company, 20, 30 years ago, you know, we didn’t change everything we did and just say, oh, do it this way because that’s what ISO says. We took ISO and said, well, we do this already, how does that fit into ISO? So that’s where we put the technology. It’s got to fit for us. There’s a lot of great ideas out there.

We vet them, we will say yep, this one’s going to be a beta test, try it out on four or five jobs, get feedback, and a lot of them fall to the wayside. We can’t do everything. Not everything fits for us or how we do business. We have a pretty rigorous process. But that’s the big thing, I’d advise that to any general contractor, even a client, it’s got to work for you and your people.

That’s how you do business—if you’ve got a good operation, you know what to do.

Daniel: So, flexibility is important.

Chris: 100%.

Daniel: So, the tech has to match or morph to your process rather than forcing you to use whatever.

Chris: Yeah. For you guys at Facility Grid, you were multipliers for us, right? We already did something well. Our vStart Process was a good process, value multiplied. It made it more productive, visible, a lot of good things came out of that. So that’s how we embraced it.

Daniel: What about mobile technology and enabling the teams in the field doing the work?

Chris: Yeah, 100%, everyone knows for any platform to be effective on construction sites nowadays hasto be enabled on a phone, tablet or computer.There’s so many people involved in so many places, it has to work. And then it’s the real time data, right? Old days we had to go back and sync things up in the trailer. People want and need real time information, and teams out in the field have to be able to quickly communicate, reach a home office or a client who might be across the country.

Daniel: With these big data center builds, the systems and the equipment in the building are becoming more and more complex or expensive, how do you guys think about asset-centric project management around those systems? How does your vStart Process help?

Chris: Yeah, I mean, vStart is asset-centric, right? Every piece of equipment was taken to all stages of installation, checkout, startup. So, back in the old days, I could go to a job, I can walk the job, and see our vStart processes through the 8.5 by 11 colored sheets of paper on equipment and understand the status of the job. I walked the whole job in two hours. Most things are pink and yellow. That means power’s on, things are good. I could understand it.

You can’t do that on these mega projects, especially data center projects. You can’t just walk it and necessarily know what’s really going on. So, you need dashboards, you need data. So, where are the assets at? How do you roll that up in a high-level to say this is what’s going on and then drill down if there’s problems?

That’s what your platform at Facility Grid does for us, gives us that ability.

Daniel: When you talk about Toyota and Kanban and Six Sigma came to mind, continuous improvement was a key thing that actually goes back to the previous session about the future workforce and how do you train people, how do you continually improve.

So, come forward there’s documentation, reporting, engineering, continuous improvement.

Chris: For knowledge transfer, we have an aging workforce. We have an aging corporate workforce of our superintendents, field supervisors, we’re all seeing it in the construction industry. So how do we transfer that knowledge? That’s a mission of ours.

And we’re pulling the younger generation and newer generation along quicker. They’re learning faster. They don’t get as many rotations, they’re put in the fight right away, and they gotta learn. How do you pass those lessons on?

With Facility Grid, we have a way to grab lessons, problems, issues, from one job and it’s documented and we just take that, pull them out, filter them, and send them to the next team so they don’t make the same mistakes or they learn from those problems before we have a lessons learned meeting at the end of a job and we fill out excel sheet and talk, but now we have a way to capture data and send this to all our data center teams, to say “this was a problem”—it’s applicable across a broader range of our projects.

Daniel: For those repeatable processes, you have to update the templates and the process changes for the next job?

Chris: That’s right. Change it, fix it, or at least identify it and bring it up as a potential problem. Maybe there’s a solution.

Daniel: So, risks— you got any stories on some of the worst things you’ve seen go wrong on a big construction project or a data center project?

Chris: Worst thing to do is going to clients saying, “hey, we’re not going to be done next week and instead of that we’re gonna be a little later.” They’re gonna ask us, “how much later?” and “why didn’t we know?” We owe our clients as much certainty as we can give them, right? Price certainty, schedule certainty, obviously the certainty of quality.

It’s trust. And you build trust with proof.

Daniel: So, if that building falls over, there’s no trust.

Chris: You know, why are we where we’re at, and what’s left to do? We need systems to have that visibility to show the clients when they get nervous and you’re behind schedule.

If we have a good platform to show where we’re at and prove it time and again, then gave that choice to the client means that certainty and we don’t have to have those uncomfortable conversations about hey, whoops, we thought we were on schedule but we’re not.

Daniel: And that has an exponential impact on the quality of the job and customer happiness and repeat business.

Chris: We always say we’re only as good as our reputation, so if that reputation fails and the client doesn’t feel they have confidence that what we say is correct, that’s a problem. Maybe we’re not on a bid list, maybe we’re just thought of differently. We don’t want that.

We want it to be like “hey, you trust us.” We may have problems, but we communicate those very proactively, so it’s not a surprise.

Daniel: How do you think the technology stack that you’ve curated is helping you manage and reduce that risk?

Chris: Everything we do is to be better at what we know how to do. It’s taking something and just saying why are we doing this? What does it do for us? What does it give us? Does it give us a better output, a better predictability?

Weather is one good example of, you don’t want to tell a client the day before the weekend that we’re not working next weekend. We have ways to use the weather data and say hey, it’s gonna rain 5 inches tomorrow. Sites can be shut down for two days due to this or that, and everybody needs to prepare. So, we always want to be proactive in anything we execute with to help us predict where we’re going or explain in a better way why something is the way it is.

Daniel: Yeah, like improving visibility into issues. Someone’s walking a site and sees a problem, with technology, you can distribute that information to everyone quicker, and therefore route to the right person whose job is to fix the problem.

Chris: In the case of quality-wise, with Facility Grid, if there’s an issue on site, the foreman of the subcontractor that has the issue is going to know right away, it gets routed directly to them. It’s documented that they have it and that they hold the response. They know the ball is in their court.

There’s so much technology out there, so much communication. You’ve got to streamline, you’ve got to be careful you’re not blasting everything to everybody. But you do need that high level of whose responsible, do they know, and were they notified properly?