How ENFRA Boosted Cx Productivity by 65% with Facility Grid

Share:

ENFRA is a national leader in energy infrastructure and Energy-as-a-Service (EaaS), delivering integrated engineering, construction, maintenance, asset management, and energy solutions to
mission-critical institutions. ENFRA helps clients in healthcare, higher education, and other essential sectors to lower emissions, reduce costs, and build resilient infrastructure.

Formerly known as Bernhard, ENFRA’s EaaS model enables institutions to optimize energy performance without compromising financial flexibility, generating measurable results in energy savings, carbon reduction, and long-term operational resilience.

Before adopting Facility Grid, ENFRA’s project team wanted to overhaul and streamline their commissioning process, as working entirely in printed spreadsheets and multiple platforms for related tasks was slowing down productivity, causing confusion, and creating unnecessary work.

When teams depend on printed spreadsheets and assorted programs for their commissioning process and QA/QC validation, this can cause multiple, simultaneous bottlenecks like the ones Enfra faced, including:

  • Scattered Data: Documentation is fragmented across multiple sources.
  • Formatting & Naming: Tedious manual standardization is required.
  • Rework Burden: Multiple submission cycles are common.
  • Payment Delays: Final payment is withheld until the package is delivered.
  • Late Documentation: Obtaining warranty letters and other records at project end is difficult.
  • Rushed Quality: The scramble for final payment often results in low-quality deliverables.

Eventually, the team decided it was time to find a better way to track their important paperwork and avoid last-minute scrambles every time a GC requested documentation.

Learn how Facility Grid helped ENFRA get out of spreadsheets and overcome their slow Cx processes: